Ellenbrook Real Estate

The whole build, lot to handover

Buying new around Ellenbrook, from the slab up

A first home in a new estate can mean two purchases at once: a block of land, and a contract to build a house that does not exist yet. These guides follow that house as it goes up, and the Western Australian rules that meet it at each stage.

A new house drawn in elevation as it goes up Read left to right: a bare lot with two survey pegs and a chalk line between them; a concrete slab; timber wall frame standing on the slab at plate height; roof trusses over the frame; the finished house with roof cover, rendered walls, a window and a front door at handover; then a dashed line running on past the house for the years after.
  1. 01 Covenants and estate design rulesBefore the house is drawn
  2. 02 Home building contractsFrom signing to handover
  3. 03 Home indemnity insuranceBefore any payment, to six years after
  4. 04 The first home owner grantPaid at slab down, then the move-in rule
  5. 05 Practical completion and defectsAt handover, and the years after

A guide to a house on its way up

Ellenbrook Real Estate is a guide, written and published by Dotto, to buying and building a new home in Western Australia. It is general information, drawn from the bodies that set the rules, and each page lists the sources it used at its foot.

RevenueWA treats a contract to build as two values added together: the building contract, variations included, and the land. Building and Energy is a division of the Department of Local Government, Industry Regulation and Safety. Landgate’s guides explain how covenants are registered on a title and removed from the register, and local governments apply the Residential Design Codes.

The City of Swan’s community profile lists Ellenbrook among the City’s suburbs and names it as one of its new urban areas. The City itself lies on Perth’s north-eastern fringe.

The build, stage by stage

Building and Energy says there is no standard set of progress claim stages or percentages across the building industry. Its fact sheet describes common stages for a new home as a general guide only, and the summary below follows its order, in our own words.

Common stages of a new home, and the guide for each
StageWhat is usually done by thenWhere the rules meet it
SlabFootings and the concrete slab are finished, and underground drainage is probably in. For a contract to build, the first construction progress payment is generally the slab, and it is the payment the grant waits on. The first home owner grant
Plate heightThe walls stand to the timber or steel plate the roof will rest on, with door and window frames built in and internal walls up. A progress payment may only be for work already done or materials already supplied. Home building contracts
Roof coverThe roof is on with its gutters, fascia and downpipes, and the house is basically watertight. The owner, someone the owner authorises, or the lender may inspect the work during the builder’s ordinary working hours. Inspecting as it goes up
Lock upExternal doors and windows are in, so the house can be secured; inside, the first pipes and wires are run and the walls and ceilings plastered. Where the work is worth more than $20,000, home indemnity insurance has covered it since before the first payment. Home indemnity insurance
Practical completionThe house is finished apart from small omissions or defects that do not stop it being used: for example, it can be lived in comfortably with the utilities connected. Defects notified within four months must be made good by the builder. Practical completion and defects

Some contracts add a stage after the finishing trades, and a house of two or more storeys may have more payments.

The counts that start from the build

Four time limits recur in these guides. Each is counted from a different starting point, set out here before any of them begins.

45 working days
From the date of the contract, the time allowed for the building permit and the Water Corporation’s approval to come through.
4 months
After practical completion, the period in which a defect notified to the builder must be made good, unless the contract allows longer.
12 months
After completion, the deadline to apply for the first home owner grant; RevenueWA says late applications cannot be accepted.
6 years
After practical completion, the period in which a claim may be made on the home indemnity policy.

Who sets the rules

  • RevenueWA takes first home owner grant applications, and an applicant who disagrees with the Commissioner’s decision can lodge a formal objection.
  • Building and Energy gives homeowners information about their rights under WA building laws, and takes building complaints. Its number is 1300 489 099.
  • Landgate publishes the guides on how covenants are created on a title and how they are removed.
  • Your local government issues building permits, and answers questions about how the Residential Design Codes apply to a particular proposal.

Where this guide stops

These pages follow one house from a bare lot to the years after handover. They describe the rules and who applies them; they say nothing about the price of land or houses, and they compare no estates, builders or suburbs. For a decision about a particular contract or block, a lawyer can advise, and Building and Energy can explain your rights under the building laws.